Or the credit gives the option of combining high solar reflective index sri roofing material and green roof.
General drawing set notes for green roof.
Instructions the following notes must be included on the plans.
See roof plan general notes.
Door tag keynote tag sheet note tag demolition note tag revision tag window type tag wall type tag ceiling height.
Provide tapered insulation as required to maintain a 1 4.
See structural drawings for top of steel t o s at all proposed roofs.
General notes general project information plan check no.
This system requires some maintenance from time to time these green roof systems lie between the extensive and the intensive and usually include a mix of plant types.
Provide guard rail roof plan general notes a.
Provide a minimum roof r value of r 24 or greater.
The roof is to perform under category 5.
Discover and save your own pins on pinterest.
Green roof energy and environment.
R9 patch existing roof deck roof insulation and roofing as required by removal of existing condensing unit associated curbs controls and piping in phase 2b.
In order to earn this credit the green roof must cover at least 50 of the roof area.
As a roof type that requires frequent maintenance intensive systems can be thought of as gardens on a roof in contrast with an extensive green roof there are almost unlimited possibilities.
General notes roof plan 1.
Location shown coordinate with mep drawings.
Numbers in the parenthesis refer to sections of the 2017 edition of the county of los angeles green building standards code table t.
Aug 22 2017 this pin was discovered by luis herrera.
Iii description of revision this revision which supersedes the goddard space flight center gsfc standard x 673 64 1e engineering drawing standards manual is intended to update and reflect the latest formats and standards adopted by gsfc.
The replacement of the roof shall be conducted in such a manner as to protect the existing building and all of its contents in their entirety.
Heat island effect roof 1 point green roofs reduce building heat absorption.
The gc shall abide by and be responsible for all requirements stated in the aia document a201 general conditions current issue unless noted otherwise.