A steep roof covering a house has a larger area and collects more rain than a shallow roof on a house of the same size.
Getting onto second level of roof.
The sections must overlap at least 3 feet on ladders up to 36 feet in length and as much as 5 feet on longer ladders.
Ways to work on a steeply pitched roof.
However you may soon find that the toughest part of the entire job is getting the heavy material up to the roof in the first place something that can be solved in a number of ways.
Hand carrying obviously the cheapest but also the most physically taxing method is simply carrying the roofing materials by hand onto the roof.
I suggest that this second layer of blocking be sloped and placing a continuous shim along the roof side on the first layer will provide the proper slope.
The ladder should be at the correct angle with the base 1 foot out from the surface it rests against for every 4 feet of height to that point.
The possibility of slipping and falling makes working on any roof dangerous but it s especially so if the roof rises more than 4 feet for every 12 feet of.
And if you enjoyed.
In this first picture one can see.
It is very common for dormers and other roof structures that have gutters above the level of the gutters on lower portions of the roof to empty onto the roof surface.
The shim width and thickness are dependent on the wood size but for two by ten wood blocking a shim of 1 2 inch by 1 5 inches will work well.
If you did don t forget to like the video as it really helps to let more people see them.
Never step up and over the top of the ladder.
When you get off the roof take the same approach holding onto the ladder and stepping around it instead of over the top.
Measure the area of each roof section to calculate gutter size.
Aim to get your little.
Hey guys i hope you found this tutorial useful.
The water is allowed to run on the roof surface and is collected by the lower gutters.
Instead hold onto the ladder with both hands and step around the ladder and onto the roof.